Case Study

Colo Move: 45 Days from Whitespace to Done

Challenge:

Tech company needed 4,500 SF colo built out in 45 days, relocating existing systems cross-country.

Solution:

Instor performed six months of work in six weeks, achieving maximum power and scalability on time and under budget.

DOWNLOAD CASE STUDY